Two winters of elm
The joint did not close on the first try, or the second. The third was close enough to call it a joint. The joint did not close on the first try, or the second. The third was close enough to call it a joint. We met the ferryman, who told us the old railway line floods twice a year and nobody minds. We used a tenon saw where a machine would have been faster and less interesting. The joint did not close on the first try, or the second. The third was close enough to call it a joint.
The quay
It took longer than the map suggested, as these things do. A garden gate is finished, in the sense that we have stopped working on it.
The joint did not close on the first try, or the second. The third was close enough to call it a joint. Measure from the same edge every time, or do what we did and learn why.
We wrote it down that evening, because by morning the details are gone. See the map. The bench hook needs sharpening more often than you think and less often than you fear.
3 comments
Cato Larsen ·
We walked this in April and the old railway line was under water. Worth knowing.
Reply
June Abernathy ·
The 1911 edition, with the fold-out map. The later one cut it.
Reply
Esme Ziegler ·
The bench facing the car park is a known problem. Somebody turned it round once and the council turned it back.
Reply
Log in to leave a comment.